Guided Hip Thrust — Plate Loaded
Made to order
A wide selection of machines is made to order, and you can customize the upholstery and frame colors at no extra cost.
Estimated lead time: 10–12 weeks.
Specifications
| Brand | BULLMAN |
| Dimensions (L × D × H) | 165 × 180 × 150 cm |
| Weight | 175 kg |
| Max Load | 300 kg |
| Steel | Tubes 50 × 100 and 40 × 80 mm — thickness 3 mm |
| Customization Options | Frame and upholstery color |
| Delivery Time | Made-to-order product, 10 to 12 weeks |
| Warranty | 5 years frame - 2 years wear parts |
Manufacturing & quality control
From raw material
to equipment.
From raw material to dispatch, every machine in this range follows a manufacturing process with checks along the way.
8 manufacturing stages · 5 checkpoints
- 01
Procurement
Purchasing raw materials.
- 02✓ Check
Incoming inspection
Checking materials before manufacturing.
- 03✓ Check
Laser cutting
Cutting and checking the parts.
- 04✓ Check
Welding
Assembling and checking the frames.
- 05✓ Check
Powder coating
Corrosion protection and inspection.
- 06
Assembly
Fitting the components.
- 07✓ Check
Final inspection
Functional and visual checks.
- 08
Preparation & dispatch
Disassembly, packing and shipping.
If a non-conformity is found: Material return, repair or removal from the process, depending on the stage.